Publication | Hard Copy Revision Date | Comment/Link |
Field Manual of the AAR Interchange Rules | July 2019 | Available through the AAR Publications. |
Code of Air Brake System Tests for Freight Brake Equipment ( AAR Standard S-486) | August 2018 | Click here to download the index. The current MSRP Section E is available through the Transportation Technology Center Inc. |
Instruction Leaflet No. 2391 Sup. 1, Repair Track Maintenance, Freight Brake Equipments 'AB' Type | April 1991 |
Repair Track Maintenance, Freight Brake Equipment DB-60 and DB-60L Control Valves | March 2018 |
Repair Track Maintenance, Freight Brake Equipment ABDX and ABDXL Control Valves | September 2004 |
CFR 49, Part 215, Railroad Freight Car Safety Standards (FRA) | 2019 |
CFR 49, Part 224, Reflectorization of Rail Freight Rolling Stock (FRA) | 2019 |
CFR 49, Part 231, Railroad Safety Appliance Standards (FRA) | 2019 |
CFR 49, Part 232, Brake Systems Safety Standards for Freight and Other Non-Passenger Trains and Equipment; End-of-Train-Devices (FRA) | 2019 |
AAR Form MD-11, Roller Bearing Hot Box and Shop Inspection Report | Electronic Version | https://www.railinc.com/md11/
|
AAR Form MD-12, AAR Failed Axle Report | April, 2013 |
AAR Form MD-115, Defective Wheels Removed, Causing Derailments, or Line-of-Road Setouts Reports | Electronic Version | To use the MD-115 Form now: - If you have an SSO ID, with permissions to Mechanical Reference Repository -
MRR Mechanical Defect User go to https://www.railinc.com/md115/
For RailInc access information go to https://www.railinc.com/rportal/mrr
|
AAR Form MD500 Truck Side Frame and Bolster Failure Report | Electronic Version |
AAR Form MD-502 For Broken & Cracked Couplers | Electronic Version | https://www.railinc.com/md502/ Note: Please start using the MD-502 from the instruction of circular letter c-13370. Form will become mandatory on January 1, 2020. |
QA-7.1 Non Conformance Report | Electronic Version |
Circulars letters that revise an Interchange Rule or the MSRP and identified as mandatory must be maintained until the next revision of the manual is published. | Electronic Version | Available through subscription to the Circular Letters. |
Certified tank car facilities need additional publications as listed in Rule 81.E | October 2014 | Refer to M-1002, C-III, Appendix B for required publications. The current MSRP Section C-III is available through the Transportation Technology Center, Inc. |
Wheel and Axle Manual, MSRP Section G-II, (only if performing ultrasonic testing of wheels) | April, 2015 | The current MSRP Section G-II is available through the Transportation Technology Center, Inc. |
Miner Field Guide | Electronic Version In addition,some files are archived,so you need WinZip or WinRar to open that files. | Electronic Field Guide Miner Field Guide pdf version (7.2a Revised 2016) |
ASC Product Guide | Revision 9 |
Amsted Rail Group's 'Shop and Field Inspection Guide' | March 2005 |
Wabtec’s “SBX Installation and Maintenance Procedure” SK-3103 | April 2019 |
American Welding Society D15.1/D15.1M:2019 | March 2019 | Per circular letter c-12200. The facility must have access to AWS D15.1 of those locations effecting weld repairs in accordance with Rule 82. To purchase booklet go the following website http://pubs.aws.org/search?q=D15.1 |